Go Back   The Supercar Registry > General Discussion > Supercar/Musclecar Discussion


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #7  
Old 02-24-2004, 03:58 PM
Unreal Unreal is offline
Senior Member
 
Join Date: May 2000
Location: Chattanooga, TN, USA
Posts: 1,334
Thanks: 1
Thanked 74 Times in 46 Posts
Default Re: REAR END DATING AFTER BUILD DATE OF CAR

Cars were not scheduled to be built, until all parts were scheduled for delivery. In other words, Fisher would not assign a body number and start a car with the expectation that the body would be pulled off to the side to wait on an engine, or rear, etc.
In the real world, though, sh!t happens. Delivery dates for parts or assemblies get missed. That's when mismatched dates occur. The rarer the assembly, the more likely the occurance. eg. BE rear.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 07:07 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.