Go Back   The Supercar Registry > General Discussion > Garages/shops..


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #10  
Old 04-10-2023, 09:48 PM
dannystarr dannystarr is offline
Senior Member
 
Join Date: Jan 2014
Posts: 511
Thanks: 0
Thanked 582 Times in 172 Posts
Default

Once all 8 lights are functioning... then I will start to run 220V to the lifts wired in series. I won't be using more than one at a time, so one leg will be fine. Same with the door openers. I may run all those off one circuit. I have what will be 25 outlets all around the shop. One every 5 feet. I may break those up into 2 breakers. It's not like I will be welding, then running the drill press, then the wire wheel etc. all at the same time. So no overload, it's just me. D
Reply With Quote
The Following User Says Thank You to dannystarr For This Useful Post:
dykstra (04-11-2023)
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 06:05 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.