Go Back   The Supercar Registry > General Discussion > Lounge


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 10-06-2020, 01:30 AM
Lynn Lynn is offline
Yenko Contributing Member
 
Join Date: Feb 2005
Location: Oklahoma
Posts: 7,799
Thanks: 91
Thanked 3,593 Times in 1,514 Posts
Default

Last pic was of the wet cement on the approach.

Here it is a few days later. You can see that I had started forming for the next segment. I wanted a sidewalk the entire length of this North wall. Because I opted to not put in a ramp between the upper (warehouse) area and the lower (workshop) area, I figured I might need to move an engine block or other heavy item from the warehouse to the work shop. So, a nice wide (54 inches) sidewalk was in order. Besides, this way, when it comes time to side, I figured I could just drive the scissor lift down the sidewalk.

Well, I fubared that one.

Let's try again.

Hopefully HERE is a pic of the approach after it dried; along with the framing for the first part of the sidewalk.
Attached Images
 
__________________
Don't believe everything you read on the internet ... Ben Franklin

Last edited by Lynn; 10-06-2020 at 01:36 AM.
Reply With Quote
The Following User Says Thank You to Lynn For This Useful Post:
67 Nova Boy (10-26-2022)
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 07:30 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.