Go Back   The Supercar Registry > General Discussion > Day 2 stuff-modified cars


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 01-29-2019, 02:28 PM
NorCam's Avatar
NorCam NorCam is offline
Senior Member
 
Join Date: Feb 2015
Location: Alberta, Canada
Posts: 4,237
Thanks: 2,754
Thanked 3,593 Times in 1,282 Posts
Default

Once I finish installing the rear end and trial fitting some Cragar's, I'll probably do the front sub frame and restore the brake lines and power booster setup. Next to that I'll have to figure out what to do with the tunnel. P/O added this aluminum tin to close up the holes from the previous Ramrod shifter and popped this aluminum cover on with a bunch of pop rivets. Not exactly my style so last night...off it came.

If I run a factory shifter I'll section in some sheet metal and and weld in in nicely. I'm not really sure what shifter I'm going to run quite yet, and may go back to the Ramrod if I can get it rebuilt first. In either case this area will require some cleanup as a minimum. That could include welding up a bunch of drilled holes from many different shift boots having been installed. It's moving along nicely now.



__________________
I like solid lifter cars, big cams and cars w/ 3 pedals in them.

Last edited by NorCam; 01-29-2019 at 02:34 PM.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 09:29 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.