Dedicated to the Promotion and Preservation of American Muscle Cars, Dealer built Supercars and COPO cars. |
|
|||||||
| Register | Album Gallery | Thread Gallery | FAQ | Community | Calendar | Become a Paid Member | Today's Posts | Search |
|
|
|
Thread Tools | Display Modes |
|
|
|
#1
|
||||
|
||||
|
<div class="ubbcode-block"><div class="ubbcode-header">Originally Posted By: YENKO DEUCE REGISTRY</div><div class="ubbcode-body"> This investment is an absolute 'no-brainer' since the payback is likely in months vs years... [img]<<GRAEMLIN_URL>>/biggthumpup.gif[/img] </div></div>
Nope, more like one week if I do the math and based on the number of labor hours a week! I have been procrastinating for too long and partially due to a lack of room but with as many cars as we have in the shop I need to raise productivity and lessen the number of days a week I work (currently 7). The restoration tech I hired last year has been a Godsend so now I need to start streamlining the rest of the shop not too mention kick Ann's butt a little. [img]<<GRAEMLIN_URL>>/naughty.gif[/img] The showroom is unfortunately being packed up and sold off as we need the room. Tired of having cars stored all over the place including taking up my 3 car garage!
__________________
Rick Nelson Musclecar Restoration and Design, Inc (retired) www.musclecarrestorationanddesign.com https://www.youtube.com/watch?v=62r-6vgk2_8 specialized in (only real) LS6 Chevelle restorations |
|
#2
|
|||
|
|||
|
If I had the room, I would have LOVED something like that. I just spent the last 3 weeks cleaning and prepping all the front end and engine hardware for my '62 to have it ready for replating. Endless hours between degeasing, wire-wheeling, bead blasting, rinsing, on & on.
Almost done. 31 J nuts to go. As John Lennon said, "My fingers have blisters on them" Verne |
![]() |
|
|