Go Back   The Supercar Registry > General Discussion > Lounge


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #29  
Old 07-25-2009, 06:57 AM
bb767 bb767 is offline
Junior Member
 
Join Date: Jul 2009
Location: near Champaign IL,USA
Posts: 27
Thanks: 0
Thanked 62 Times in 4 Posts
Default Re: Thanks Verne & Tom

We just started on one end and worked our way through the building. That took about 5 months. The piles were 1.)keep for sure, 2.) keep and revisit whether to keep, 3.)recycle or discard. We wound up recycling 48 tons of steel from inside and out. Discarded 272 tires. I've still got another building to go through that needs to be emptied by October. Don, Dennis and Rick never made it to that one. That building is set to be torn down this fall after I get the replacement built. Anyone need some NOS shocks for a 1928-30 Chevy or a set of new, in the box, flat head Ford pistons and rings? That's just some of the parts found.

Before when I bought it:



After much sweat:



The inside took 1 1/2 years and the outside (5 acres) is still in progress.

Thomas
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 04:48 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.