View Single Post
  #10  
Old 10-06-2020, 01:30 AM
Lynn Lynn is offline
Yenko Contributing Member
 
Join Date: Feb 2005
Location: Oklahoma
Posts: 7,799
Thanks: 91
Thanked 3,593 Times in 1,514 Posts
Default

Last pic was of the wet cement on the approach.

Here it is a few days later. You can see that I had started forming for the next segment. I wanted a sidewalk the entire length of this North wall. Because I opted to not put in a ramp between the upper (warehouse) area and the lower (workshop) area, I figured I might need to move an engine block or other heavy item from the warehouse to the work shop. So, a nice wide (54 inches) sidewalk was in order. Besides, this way, when it comes time to side, I figured I could just drive the scissor lift down the sidewalk.

Well, I fubared that one.

Let's try again.

Hopefully HERE is a pic of the approach after it dried; along with the framing for the first part of the sidewalk.
Attached Images
 
__________________
Don't believe everything you read on the internet ... Ben Franklin

Last edited by Lynn; 10-06-2020 at 01:36 AM.
Reply With Quote
The Following User Says Thank You to Lynn For This Useful Post:
67 Nova Boy (10-26-2022)