Go Back   The Supercar Registry > General Discussion > Technical & Restoration


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 03-17-2008, 12:52 AM
Bill Rose Bill Rose is offline
Yenko Contributing Member
 
Join Date: Sep 2004
Location: New Jersey
Posts: 944
Thanks: 18
Thanked 24 Times in 13 Posts
Default Re: New project coming along

ElCamino Update: With the chassis finished, it was time to start the body work. The car is remarkably rust free. Only a couple small patches on the roof, where the vinyl top was originally. The biggest repair is the left side, where it was hit in a slow speed crash (thanks Mark Sheppard for that info). The rocker and lower quarter was pushed in. Got an nos quarter (thanks Greg Cullium/Jim Henke) and a new rocker. It took several evenings, some cut up knuckles, a few takeout dinners, and a bunch of 4 letter words, but the rocker and quarter are out. I also rustproofed all the "innards". Then a buddy of mine helped me out welding the rocker. The quarter is fitted and ready for welding tomorrow. Also got a new used door, which is in perfect condition. I stripped the door and fitted all the parts and everything looks good. The it's off to the blaster. i will have the interior, firewall, bed, and the whole bottom of the body blasted. Thats where I am today. I'm gonna keep posting this stuff, till someone tells me to stop.

Welding the rocker:



Rocker, door, and quarter on:

__________________
69 El Camino
69 Nova
C7 Vette
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 02:13 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.