Go Back   The Supercar Registry > General Discussion > Supercar/Musclecar Discussion


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #9  
Old 10-18-2025, 02:01 PM
Too Many Projects's Avatar
Too Many Projects Too Many Projects is offline
Yenko Contributing Member
 
Join Date: Oct 2020
Location: Town of Troy, WI
Posts: 5,235
Thanks: 2,785
Thanked 4,099 Times in 1,849 Posts
Default

If it's that close to done and they are dragging their feet, it's time to either strap on a safety harness and start riding their ass to finish it or take it out. 4 years is 1-2 years too long already for a "qualified" shop to have completed the work.
Too many stories the same as yours about this situation. I got caught in one several years ago too, but after 9 months of him screwing up all the metal work I did to get it ready for him, I showed up one Saturday morning with my trailer and loaded it all up and left.
Give them a timeline of when you expect it done and be there ready to take it out in whatever condition it's in.
__________________
Mitch
1970 Chevelle SS
1966 Chevelle SS
1967 Camaro ss/rs
1938 Business coupe, street rod
2000 FXSTS, original owner, 13k miles
Reply With Quote
The Following User Says Thank You to Too Many Projects For This Useful Post:
Canuck (10-18-2025)
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 09:18 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.