Go Back   The Supercar Registry > General Discussion > Chevrolet


Reply
 
Thread Tools Display Modes
  #1  
Old 12-16-2021, 06:46 PM
Too Many Projects's Avatar
Too Many Projects Too Many Projects is online now
Yenko Contributing Member
 
Join Date: Oct 2020
Location: Town of Troy, WI
Posts: 5,039
Thanks: 2,637
Thanked 3,891 Times in 1,756 Posts
Default

Onto the body. There wasn't much left inside to begin with, but I had to remove all the seats and headliner. First, I had to remove the gate, as there was too much weight behind the lift arms to balance well.


As rusted out as the main cabin floor is, the cargo floor and spare wheel well are in amazingly good condition.




The rear seat upper back is bolted thru the wheel house and looking at the amount of rust, I just took the easy way out and ground them off flush with the reinforcement plate...









Then I went after the headliner and bows. It, too, is in very nice condition and I wanted to save it intact, in case it would be wanted for a survivor car. Little did I know I was embarking on pulling out more than 600 staples !!!






He had, also, bought a very expensive rotisserie about a year ago. I put that together last spring and it has sat in my way ever since too. The floor at the rockers is VERY rusted out and I was barely able to lift the body off the frame without it caving in. I had to add 400#s of "ballast" to the front floor and cowl with crushed glass media.





On the roto and ready to balance. I have a homemade roto that lacks the screw jacks for balancing. Wow, are those a treat compared to using a bottle jack under the arm T's...





Before I removed the doors, I welded in 2, 1'' square tubing bars to hold it in shape.





I cut out what little was left of the floor perimeter while on it's side.





Rolled it back over and knocked it out.





__________________
Mitch
1970 Chevelle SS
1966 Chevelle SS
1967 Camaro ss/rs
1938 Business coupe, street rod
2000 FXSTS, original owner, 13k miles
Reply With Quote
The Following 5 Users Say Thank You to Too Many Projects For This Useful Post:
69M22Z (12-18-2021), big gear head (12-28-2021), dykstra (12-17-2021), NorCam (12-18-2021), scuncio (12-16-2021)
  #2  
Old 12-16-2021, 06:51 PM
Too Many Projects's Avatar
Too Many Projects Too Many Projects is online now
Yenko Contributing Member
 
Join Date: Oct 2020
Location: Town of Troy, WI
Posts: 5,039
Thanks: 2,637
Thanked 3,891 Times in 1,756 Posts
Default

First order of repair is the lower inner quarter structure. It is supposed to be welded to the floor, but most of that area is gone. I bent up a piece of 18 gauge to patch it with. I'll need to do the same on the other side when next I go to work.











__________________
Mitch
1970 Chevelle SS
1966 Chevelle SS
1967 Camaro ss/rs
1938 Business coupe, street rod
2000 FXSTS, original owner, 13k miles
Reply With Quote
The Following 4 Users Say Thank You to Too Many Projects For This Useful Post:
69M22Z (12-18-2021), big gear head (12-28-2021), dykstra (12-17-2021), NorCam (12-18-2021)
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 09:30 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.