Go Back   The Supercar Registry > General Discussion > Supercar/Musclecar Discussion


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #24  
Old 06-02-2019, 08:22 PM
1967Z28's Avatar
1967Z28 1967Z28 is offline
Yenko Contributing Member
 
Join Date: Oct 2002
Location: Golden Bear State, USA
Posts: 2,180
Thanks: 2,049
Thanked 1,445 Times in 525 Posts
Default

Quote:
Originally Posted by jeffschevelle View Post
The trim tag date is based on when the vehicle order was input into the system at the assembly plant, aka the "broadcast date". Actual construction of the car started after that.
That is an assumption on your part that I believe is incorrect. I have data on a number of Camaros that were actually built the week prior to the build date on the tag. Also, the body numbers were in the same range as cars that were built a week later. Example, a car is built at the end of one month when taking the VIN into account (and NCRS report backs up car was built during last week of the month) but the trim tag and body number are for the first week of the following month. You can't input a vehicle order into the system at the plant a week after the car has already been built.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 08:25 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.