Go Back   The Supercar Registry > General Discussion > Supercar/Musclecar Discussion


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #14  
Old 12-08-2018, 06:28 PM
BCreekDave BCreekDave is offline
Senior Member
 
Join Date: Sep 2016
Location: Dayton Ohio
Posts: 926
Thanks: 317
Thanked 450 Times in 252 Posts
Default

Any opinions on the quality of a block that is cast and machined on the same day? My tool&die background would make me a bit wary of machining a block when in theory it could still be cooling? I would think 2 or 3 hours minimum to fully cool. Maybe they sequenced them OK. Was the Pad stamp done when the engine was fully assembled and ready to leave Flint? I suppose it could have been cast on 3rd shift and finished and stamped on 2nd shift (same day).
__________________
70Z28 04B Norwood Forest Green-white Stripes Black DeLuxe Interior
Owned since 1978 - First Car
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 06:15 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.