Go Back   The Supercar Registry > General Discussion > Technical & Restoration


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 01-14-2008, 03:06 AM
Bill Rose Bill Rose is offline
Yenko Contributing Member
 
Join Date: Sep 2004
Location: New Jersey
Posts: 944
Thanks: 18
Thanked 24 Times in 13 Posts
Default Re: New project coming along

Yet another update for you guys who are sick of watching football.
The engine was off to the machine shop this week. It needed to go 30 over. He also align honed it. It's getting a new steel crank, dimple rods, forged domed pistons. New valves, springs, retainers, etc. All the machine work is done, and should be all assembled by the end of the week. Here's a shot before honing.


Here's a shot of the pistons. I understand they go into the holes of that thing in the picture above.



__________________
69 El Camino
69 Nova
C7 Vette
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 11:37 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.