Go Back   The Supercar Registry > General Discussion > Technical & Restoration


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 01-03-2008, 07:49 AM
Bill Rose Bill Rose is offline
Yenko Contributing Member
 
Join Date: Sep 2004
Location: New Jersey
Posts: 944
Thanks: 18
Thanked 24 Times in 13 Posts
Default Re: New project coming along

[ QUOTE ]
Beautiful job! I still want your floor though! Wanna swap? Body for subframe. I'd do the body work and you can do my frame????? Umm half a frame anyway. LOL Bring on the body!

[/ QUOTE ]

Any time Jed. I can have the body there in 2&1/2 hrs, I'll bring your 1/2 of a frame home and have it back to you in a couple weeks. As long as you have the ElCamino is painted by then.

Steve, ya just have to go out there every night and get something done, no matter how much you wanna play on the computer. . I was outside in my driveway on New Years eve, spray painting new u joints under the flood lights when it was 25 degrees outside. The neighbors thought it was a little strange when they came home, but their used to this kind of thing.
__________________
69 El Camino
69 Nova
C7 Vette
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 09:54 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.