Go Back   The Supercar Registry > General Discussion > Pontiac


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 06-25-2008, 06:11 PM
ANDY M's Avatar
ANDY M ANDY M is offline
Yenko Contributing Member
 
Join Date: Apr 2004
Location: Columbus, OH
Posts: 2,011
Thanks: 59
Thanked 41 Times in 24 Posts
Default Re: 72 T/A progess

Better hang it up. There must be about 20 or 30 hours in that thing, and all it takes is one rock.
Steve, how many total hours do you figure you have in this project?
__________________

COPO 9561/9737 M40 X11D80
13.37 @ 105.50 on pump gas,drove it to NATL TRAILS and back [email protected] SCR22
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 01:37 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.