Go Back   The Supercar Registry > General Discussion > Lounge


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 02-21-2011, 03:12 AM
jasonL78 jasonL78 is offline
Senior Member
 
Join Date: Mar 2006
Location: New york
Posts: 1,420
Thanks: 4
Thanked 414 Times in 83 Posts
Default Re: My new 1968 Nova L79 project.

<div class="ubbcode-block"><div class="ubbcode-header">Originally Posted By: Nova Jed</div><div class="ubbcode-body">Looks great! How many hours do you have into both sides? </div></div>

Jed I used to keep track but that got old real quick. It is real hard sometimes doing this type of work by yourself. Hours pass and I look back and say that is all I got done! I am going to say I have to have at least 100 + hours in both quarters and outer wheel wells. That doesn't include the trunk pan install. Just to weld one side back onto the car I bet it took me 6 hours or so.

Have you been recording your hours on your 69 nova?

Thank you everyone for the kind words. I feed of all the replys, it makes you feel good about taking on a project like this. I must admit sometimes I ask myself why??? LOL! [img]<<GRAEMLIN_URL>>/smile.gif[/img]

This type of work is truely a labor of love!

Jason


Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 05:46 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.