View Single Post
  #96  
Old 11-25-2003, 01:21 PM
Steve_Hoog's Avatar
Steve_Hoog Steve_Hoog is offline
Senior Member
 
Join Date: Nov 2003
Location: Tulsa OK
Posts: 1,275
Thanks: 0
Thanked 0 Times in 0 Posts
Default Re: 70 Judge RAIV and V continuation

OK, hold on a second. As I was walking through the parking lot I was thinking, we never suggested the car was built with the motor. We have been told that it was put in the car after production, in engineering. I don't know how long engineering typically had a car, but in the middle of winter there wouldn't be much hurry. Certainly for a car intended for the strip.

The date of when Knafel took delivery would be crucial. And we are still working off of Rita's theroy about the date code, that may not be right.

I personally have waited 6 months after ordering a GMC, because they were out of 5 speed tranny's. So the car waiting in engineering for a couple of months may not be to far out of reach.

I threw up the window sticker on the GMC just for grins, was an awesome truck!!


Attached Images
 
Reply With Quote