View Single Post
  #7  
Old 10-31-2025, 02:16 AM
Too Many Projects's Avatar
Too Many Projects Too Many Projects is offline
Yenko Contributing Member
 
Join Date: Oct 2020
Location: Town of Troy, WI
Posts: 5,282
Thanks: 2,809
Thanked 4,167 Times in 1,871 Posts
Default

And so, it begins. I have been waiting on my bodyman/painter to take the Camaro to his place for interior paint for 2 months now and today I kicked it into the back storage building and brought the Chevelle into the shop to start this project.
First order was to remove the seized calipers, so I can roll it around..LOL The pistons did push back into the bores, so they aren't rusted completely. Then I removed the seats to take them back to the storage shed and get them out of the way. I had procured a rear seat core over time too, but thought ahead and left that in the back shed before I drove the car to the shop building. Thought I took a pic of the interior without the seats, but that is on my phone and NO, I have a heck of a time getting pics from there to here. I'll take one with the camera tomorrow...
REALLY looking forward to get started on this tear down.
Attached Images
  
__________________
Mitch
1970 Chevelle SS
1966 Chevelle SS
1967 Camaro ss/rs
1938 Business coupe, street rod
2000 FXSTS, original owner, 13k miles

Last edited by Too Many Projects; 10-31-2025 at 02:24 AM.
Reply With Quote
The Following 13 Users Say Thank You to Too Many Projects For This Useful Post:
67SS4spd (10-31-2025), cheveslakr (10-31-2025), dykstra (10-31-2025), gtomike1967 (10-31-2025), L78_Nova (10-31-2025), mhurd (10-31-2025), olredalert (10-31-2025), PeteLeathersac (10-31-2025), Pro Stock John (10-31-2025), ragtop (10-31-2025), SS427 (10-31-2025), Tenney (10-31-2025), Woodrock (11-01-2025)