View Single Post
  #28  
Old Yesterday, 01:14 PM
scuncio's Avatar
scuncio scuncio is offline
Yenko Contributing Member
 
Join Date: Oct 2000
Location: Michigan
Posts: 14,220
Thanks: 2,964
Thanked 7,446 Times in 3,359 Posts
Default

For sure. Today that would require a “TWO” (temporary work order) which is considerably faster than a formal engineering change request.

Quote:
Originally Posted by bergy View Post
It’s actually not a big job to change the embossing on those molds. The pattern shop probably had updated versions along with older versions on the shelf. It always amazes me that people think that there are hard cut off dates for cosmetic changes. The updated mold could be damaged in production - supervisor calls the pattern shop for a mold replacement - and the old mold replaces the damaged mold. Iron patterns were the same way. Cosmetic changes could be run interchangeably. Engineering changes were more disciplined.
Reply With Quote