The office and the Museum have been hogging a lot of my time. But did get some work done on my shop today.
Just about finished with my suite of add ons to the warehouse side. I did not want to take up any shop space. Entire suite is only 17 feet long. Mob/broom closet, kitchenette (no sink... but a beer fridge), water closet (just a toilet and a mini deep sink) and a utility room to house the "water heater". Water heater is a point of use design. Just enough hot water to wash up. I had purchased a gas tankless, but didn't need it, as I nixed the plans to include a shower.
Got the granite countertop put in the kitchenette. Was going to do a backsplash, but seeing there is no sink (just the mini fridge and a countertop microwave) decided to just caulk it. Will paint the caulk wall color when it dries.
Used black pipe for the toilet paper and paper towel dispenser. My grandsons asked how I change the paper roll. Showed them that you just unscrew the flange on the end.
Did more sheetrock work today. Still need to trim everything.
__________________
Don't believe everything you read on the internet ... Ben Franklin
|