Making some serious progress now.

Got the 400 amp service meter and panel set in. Electrician pulled 500 nmn cables on Saturday. Each cable is one inch in diameter.

I have the bath, kitchenette, broom closet and utility closet all framed out. Did 2x6 construction with 3/4 plywood on top so I can store stuff up there.

Have water to the building, but waiting on the plumber to finish running everything inside.

Latest pics I have, but these are over a month old. I will have time to catch up on the thread with more pics, as I am having my second shoulder joint replacement surgery tomorrow. Had the left one done in Jan, so this is the right one. Not looking forward to doing everything left handed for the next 6 to 12 weeks. I was able to type a little after just a week last time. We will see how it goes.

Figured 2020 already sucks so bad, that I may as well have BOTH shoulders done in the same year. What a way to start and finish.
Attached Images
   
__________________
Don't believe everything you read on the internet ... Ben Franklin
Reply With Quote
The Following 2 Users Say Thank You to Lynn For This Useful Post:
67 Nova Boy (10-26-2022), PeteLeathersac (11-24-2020)