Thread: Laaaaaaand HO!!
View Single Post
  #87  
Old 12-09-2018, 12:38 PM
A12pilot's Avatar
A12pilot A12pilot is offline
Yenko Advertising Member
 
Join Date: Nov 2014
Location: DFW
Posts: 2,793
Thanks: 0
Thanked 5,289 Times in 1,227 Posts
Default

Thanks men! Yes, lots going on here. Before I left on this trip I did finish out the tack room. You'll notice the vaulted ceiling in there and it's sort of a structure insidea structure. Either outer side of the tack room is a solid wall floor to ceiling. The back wall will be a stable, and the front wall is the backside of the trailer storage area. Both will be insulated where it meets the room's outline and then sheeted with plywood. The back where the stall will be will also has 2x6 boards for added protection against that errant horse kick. So next week the plumber and electrician are coming out so I can move this along and then finish out the interior.

Yes, there is a missing rafter up there, which is intended so I can roll out insulation on the roof once that half gets the ceiling installed. I can get access to the front though the open wall. The whole exterior of the tack room, tractor and trailer storage areas, as well as the ceiling will be tongue and groove pine with cedar trim. I should have that done by Tuesday!

Stay tuned.... more to come on the next episode of "This F%#%ing pain in the a%# piece of crap House"

Cheers
Dave
Attached Images
     
Reply With Quote
The Following 2 Users Say Thank You to A12pilot For This Useful Post:
markinnaples (12-09-2018), Xplantdad (12-09-2018)