Thread: L78 head dates
View Single Post
  #3  
Old 07-09-2014, 11:13 AM
bergy's Avatar
bergy bergy is offline
Yenko Contributing Member
 
Join Date: Feb 2005
Location: Pennsylvania, Florida
Posts: 2,878
Thanks: 1,050
Thanked 1,675 Times in 443 Posts
Default Re: L78 head dates

Remember that the head dates are cast in at the foundry. To be the same day - the head had to be cast, work its way all the way through cooling and finishing (6-7 hours at best), ship to the motor plant (next door), get all the way through head machining & build, transport to the engine build line, and install. All that had to happen in 16 to 18 hours (start of foundry first shift to end of motor plant second shift). Not impossible, but WHEW!
Reply With Quote