View Single Post
  #3  
Old 04-11-2013, 11:49 AM
njsteve's Avatar
njsteve njsteve is offline
Yenko Contributing Member
 
Join Date: Nov 2003
Location: NJUSA
Posts: 8,477
Thanks: 9
Thanked 2,972 Times in 914 Posts
Default Re: The New Project: Part Deux!

Finally finished the passenger side wheel tub repairs and slopped the seam sealer on, just like the assembly line did. The best method to reproduce the original application style seemed to be by wearing rubber gloves and applying three parallel lines of the sealer next to each other. Then you smeared it down the entire length of the seam with your index, middle and ring fingers held tightly alongside each other. This seems to duplicate the "triple stripe" application that is on my Gramma's 75 and the other car's I have examples of.





So, in the end, the Votech adult education course at the local highschool really paid off. For $400 and 12 weeks of Tuesday night dedication I was able to use their entire body shop and all the associated welding and bodywork equipment, and get expert tutelage on its use. I removed and replaced both trunk drop-offs, repaired the passenger side trunk-to-wheel tub section, and the rocker-to-wheel tub section, and refinished the trunk floor. Sure beats the estimate I got to have the work done (by around $7000). [img]<<GRAEMLIN_URL>>/grin.gif[/img]
Reply With Quote