Thread
:
The New Project: Part Deux!
View Single Post
#
114
06-10-2012, 09:14 PM
njsteve
Yenko Contributing Member
Join Date: Nov 2003
Location: NJUSA
Posts: 8,480
Thanks: 9
Thanked 2,974 Times in 916 Posts
Re: The New Project: Part Deux!
And here is the finished interior. Other than the carpet and the package tray, everything that came out, went back in (though a lot cleaner and tighter, especially the seat covers). Even the 40 year old original floor mats are back in place. I will probably redye to steering wheel next week. That SEM Landau black interior spray dye is awesome. I misted most of the interior plastic parts and the stuff rejuvenates black interior pieces like magic. Just a light dusting evens it all out. And it dries in seconds.
I also pulled the gauges and tried rebuilding the clock but it wasn't the points, the clock's electrical windings are bad. So I'll add a clock to the shopping list.
Those white circles are dust specs on my hand-me-down garage camera. Sorry about that.
njsteve
View Public Profile
Find all posts by njsteve