View Single Post
  #1131  
Old 12-27-2010, 03:35 AM
njsteve's Avatar
njsteve njsteve is offline
Yenko Contributing Member
 
Join Date: Nov 2003
Location: NJUSA
Posts: 8,378
Thanks: 8
Thanked 2,789 Times in 855 Posts
Default Re: 72 TA : New Project

Once all the underside repairs were done, I grooved out the corresponding areas on the top side and applied more fiberglass filler to repair the remnants of the stress cracks on top.

Here is the semifinished shaker dome after all the fiberglass repairs were done. Still needs some primer, redrilling of the rivet holes to the correct size, and epoxying of the door assembly into the opening, before the metal base plate can be riveted back on.





And the underside:



The before and after of the reconstructed missing edge:





Reply With Quote