The Supercar Registry

The Supercar Registry (https://www.yenko.net/forum/index.php)
-   Garages/shops.. (https://www.yenko.net/forum/forumdisplay.php?f=136)
-   -   Finally.............my new shop (https://www.yenko.net/forum/showthread.php?t=151095)

napa68 10-02-2018 09:49 PM

Finally.............my new shop
 
Recently, my wife and I have started a new chapter (adventure). I sold my parts business and semi retired. We picked up root and are in the process of moving to our home in northern Wisconsin (love to snowmobile).

So, our old house is sold (6 days). That mean time to get going on the new shop. 40x56 steel building............radiant heat floors.............high ceilings.............a hoist....... and more room for all of our stuff. I now can keep it call in one place!

The push is on the get the site cleared and prepped, in order to pour concrete this year

Off we go! I suspect the fill is going to be a killer.

http://i1043.photobucket.com/albums/...ps8ykkdhqn.jpg

http://i1043.photobucket.com/albums/...psc7pr6bwk.jpg

http://i1043.photobucket.com/albums/...psvkzdg9bc.jpg

http://i1043.photobucket.com/albums/...psldpzldo8.jpg

http://i1043.photobucket.com/albums/...pspuvclh79.jpg

http://i1043.photobucket.com/albums/...psqgg0afa9.jpg

http://i1043.photobucket.com/albums/...psmiz0zyba.jpg

wheelhop 10-02-2018 10:11 PM

Looks great, keep the pics coming!

Crush 10-02-2018 10:18 PM

Great job brother!!! Hopefully I’m not to far behind!!

TDW 10-02-2018 11:00 PM

Oh yeah! That building site is KILLER!. Best of luck with the process.

Damien 10-02-2018 11:34 PM

Looks like a beautiful part of the world. Keep up the updates!

m22mike 10-02-2018 11:35 PM

Nice size shop, keep us in pictures :biggthumpup:

Postsedan 10-03-2018 12:47 AM

Living The Dream!

VERY EXCITING :)

Dan

mockingbird812 10-03-2018 12:57 AM

Great looking piece of land!!! Can’t wait! :biggthumpup:

Xplantdad 10-03-2018 02:16 AM

Awesome Tim! No more laying on the ground to work under the cars! :) :worship:

Jonesy 10-03-2018 02:31 AM

I just built the exact same thing. Steel building, in-floor heat, 12 foot ceilings, got a lift. I went 60x72 and I still think I should have gone bigger!! :D

napa68 10-04-2018 11:00 AM

Quote:

Originally Posted by Jonesy (Post 1416714)
I just built the exact same thing. Steel building, in-floor heat, 12 foot ceilings, got a lift. I went 60x72 and I still think I should have gone bigger!! :D

I though about bigger. Like a fish bowl, this will "contain" my habits................maybe

flyingn 10-04-2018 11:06 AM

looking good!!!

RPOLS3 10-04-2018 03:57 PM

Nice Tim! Congratulations on everything!

napa68 10-04-2018 10:55 PM

This boy and girls, is what 700 yards of fill looks like!

http://i1043.photobucket.com/albums/...s7yjldvnm.jpeg

napa68 10-04-2018 10:57 PM

Quote:

Originally Posted by Damien (Post 1416687)
Looks like a beautiful part of the world. Keep up the updates!

It really is IMO. I've wanted to live here for 30 years. Here is a pic I took off of my deck on Tuesday afternoon. Too bad the sun was not out.

http://i1043.photobucket.com/albums/...psn3ayeidx.jpg

Crush 10-04-2018 11:54 PM

Awesome, trees are turning already! Soon snow...and Packer Football!

mockingbird812 10-05-2018 01:52 AM

Gorgeous scenery!!!!:biggthumpup:

Charley Lillard 10-07-2018 11:57 AM

Looks like you could build it out of logs.:beers:

A12pilot 10-07-2018 11:36 PM

Jeezum....I don't think I'd get anything done with a view like that! Awesome! Congrats!

Cheers
Dave

napa68 10-17-2018 11:37 PM

They got back on things here this week. I believe we got about 5" of rain, so the excavator had to pull off for a week. Looks like site prep will be done this week and should be ready for concrete towards the end of next week.

http://i1043.photobucket.com/albums/...psuzqrtueo.jpg

http://i1043.photobucket.com/albums/...psutgnptdg.jpg

http://i1043.photobucket.com/albums/...psokbnp8p2.jpg

http://i1043.photobucket.com/albums/...ps8tccqd6e.jpg

http://i1043.photobucket.com/albums/...psh47kgyjh.jpg

http://i1043.photobucket.com/albums/...ps2jxs1f7b.jpg

A12pilot 10-20-2018 02:28 PM

I'm right there with you rowing the same oar in the same boat:laugh: Waiting on concrete and for it to stop the heck raining so we can get foundations poured too!!

Looking forward to updates! :3gears:

Cheers

Dave

dykstra 10-24-2018 12:25 AM

Congrats! Can’t wait to see the new shop!

72-SS-L48 10-31-2018 08:55 PM

So jealous. Congrats on the build!

Caseys69 11-10-2018 01:30 PM

What part of northern Wisconsin? My grandparents are in Arbor Vitae, such an awesome area

earntaz 11-10-2018 08:02 PM

Quote:

Originally Posted by Caseys69 (Post 1421188)
What part of northern Wisconsin? My grandparents are in Arbor Vitae, such an awesome area

Way, way up nort ... almost Youpper land ... LOL

napa68 11-16-2018 11:37 AM

Quote:

Originally Posted by Caseys69 (Post 1421188)
What part of northern Wisconsin? My grandparents are in Arbor Vitae, such an awesome area

We are about 15 min north of that yet in Presque Isle

kwhizz 11-22-2018 11:46 AM

Spoiled Brat !!!!!

napa68 11-22-2018 01:36 PM

Quote:

Originally Posted by kwhizz (Post 1422652)
Spoiled Brat !!!!!

Yep.............................kinda. I got boned by the mason who went and took on a basement ahead of me, and then the winter set in. No shop til next year. Tracey already shut me down on chasing her around the house. So.................I sit and wait for the snowmobile trails to open up!

https://i1043.photobucket.com/albums...pspseornnq.jpg

napa68 05-19-2019 02:50 PM

After a winter slumber, the road weight limits have finally come off. Now, we can get back to work. This past week.............

https://i1043.photobucket.com/albums...psrsg5vkor.jpg

https://i1043.photobucket.com/albums...psjamxrsp5.jpg

https://i1043.photobucket.com/albums...psgauh1wlw.jpg

https://i1043.photobucket.com/albums...psiladoksd.jpg


The building should get delivered the week of the 27th!

Xplantdad 05-19-2019 03:08 PM

Wow Tim. nice!!:biggthumpup:

mockingbird812 05-19-2019 04:01 PM

You’ve got to be excited! Keep the pix coming!!!

Zedder 05-19-2019 04:16 PM

Holy crap that is going to be awesome!

firstgenaddict 05-19-2019 11:09 PM

6" or 8 " over and above the top of the PEX?

napa68 05-20-2019 11:38 AM

Quote:

Originally Posted by firstgenaddict (Post 1448208)
6" or 8 " over and above the top of the PEX?

6 with the PEX included

Postsedan 05-20-2019 11:44 AM

I am very happy for any good car guy that gets to Build his very own Dream Garage.

Love it! Keep the pics coming.

Dan

A12pilot 05-20-2019 11:49 AM

Excellent! To quote a famous man..."Let the wurd go fouth from this day fourwahd...progress pics are needed!!" You gotta be so psyched!

Cheers
Dave

napa68 06-06-2022 12:15 AM

Ain't I the DB for dropping the mic on this one. Here are a bunch of progress pics from back in 2019. I'll update later on what is looks like today.......

https://i.imgur.com/10PoVG5h.jpg
https://i.imgur.com/WkN94O3h.jpg
https://i.imgur.com/g7IL47Bh.jpg
https://i.imgur.com/Koq3EXZh.jpg
https://i.imgur.com/l3p6jLfh.jpg
https://i.imgur.com/0eJZdYph.jpg
https://i.imgur.com/4prrXC6h.jpg
https://i.imgur.com/6SYbYWhh.jpg
https://i.imgur.com/dTIeCRah.jpg
https://i.imgur.com/DoGL20Hh.jpg
https://i.imgur.com/ccrnGZgh.jpg
https://i.imgur.com/C7n7rOBh.jpg
https://i.imgur.com/m3YQSfQh.jpg
https://i.imgur.com/DK3ULDuh.jpg
https://i.imgur.com/Th9Ybpph.jpg

Too Many Projects 06-06-2022 01:27 AM

Isn't it amazing how fast those buildings go up ? We moved in Sept of '19 and had a 30X48 contracted for October. We had a month of rain then too and it got delayed until November. When the material got here, it took 2 guys 3 DAYS and it was done, except for the overhead door. CRAZY what they did in 3 days.

COPO 06-06-2022 04:36 AM

Thanks for posting the pictures of your shop build. Did you go with a 6" slab throughout or only where you planned to have lifts? What side wall height did you go with? Also, do you plan to treat the concrete floors with epoxy or some other coating?

Any lessons learned from the shop build that you would do differently today if starting over?

napa68 06-06-2022 11:36 AM

Quote:

Originally Posted by Too Many Projects (Post 1592569)
Isn't it amazing how fast those buildings go up ? We moved in Sept of '19 and had a 30X48 contracted for October. We had a month of rain then too and it got delayed until November. When the material got here, it took 2 guys 3 DAYS and it was done, except for the overhead door. CRAZY what they did in 3 days.

It took about 4 months quite honestly. As luck would have it, my contractor was not the best by far......

Happy with the building for the most part, but the process left an awful lot to be desired.


All times are GMT. The time now is 03:08 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.


O Garage vBulletin Plugins by Drive Thru Online, Inc.