The Supercar Registry

The Supercar Registry (https://www.yenko.net/forum/index.php)
-   Ford-Mercury (https://www.yenko.net/forum/forumdisplay.php?f=123)
-   -   My "shop find" Bullitt Stang! (https://www.yenko.net/forum/showthread.php?t=139149)

Ryan1969Chevelle 12-14-2017 12:44 AM

Keep the hits coming!!

Ryan

cook_dw 12-14-2017 02:08 PM

https://encrypted-tbn0.gstatic.com/i...nTrGfXsnqRv8VG-a-https://i.pinimg.com/736x/36/5d/7e/3...nge-drinks.jpg

A12pilot 12-17-2017 11:06 AM

5 Attachment(s)
Perfect, Darrell! Now I think I need a jar of that in the shop! :haha: Speaking of shops.... I'm moving the Bee today down a few buildings to the new, temporary, smaller yet fully functioning, rental shop. So of course, I had to get few shots outside. Wish the sun was out, but at least it didn't rain on the push over to the new digs. A far cry from jumping SF steeets! I think I averaged about 2mph.... but man, with no engine in there, looks like I'm cruising over the streets in the Russian District as the chase begins! :biggthumpup:

More to come....

Cheers
Dave

Dave Rifkin 12-18-2017 11:53 AM

My God you do some really nice work.

Crush 12-18-2017 12:07 PM

first dibs win the Mustang comes for sale!!

Woj 12-18-2017 02:28 PM

Crush,

I think you are about 8th in line now! 😆

Phil Woj.

Crush 12-18-2017 03:02 PM

Let the bidding begin!!!

whitetop 12-18-2017 05:41 PM

Hello Dave

Love the build. Can you tell me approx how many hours you have in body repair and painting alone (not mechanical work and not reassembly of the car)


Thanks Dave

A12pilot 12-19-2017 12:24 AM

Wow! Thanks, guys! I appreciate the compliments! Dave.... responded to your PM. I'll post up here after you reply. More later this week!

Cheers
Dave

A12pilot 12-20-2017 12:21 PM

Well..... let's see:hmmm: when the car was down to a shell, metal work was a complete one-piece floor, two lower quarter panel patches, and some minor patches here and there. I'd say maybe 60hrs in rust repair metal work. Bodywork, start to finish, is roughly 450hrs. Remember that roof? :rolleyes2: Wetsanding and buffing would be another 40hrs at least. Then add on top of that another 500hrs to pay someone to fix my screw ups!:bs: But seriously.... I'd say from a shell to finish paint is around the 560hr mark.... plus or minus a little. I know the Bee I had well over 700hrs into it, and actually lost count... but that car is as long as the Hindenburg with as many facets in the bodylines to deal with! "The curves, the lines, there's so many waves, ladies and gentleman...Oooh the Humanity!" Ahem..... where was I? :smile: Hope that helps and understand I'm not a shop.... or a professional ... or even know what the heck I'm doing! Your times may vary.....

Cheers:beers:
Dave


All times are GMT. The time now is 01:18 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.


O Garage vBulletin Plugins by Drive Thru Online, Inc.